|
| U-631 | Type VIIC |
| Feldpost Number | M 22 458 |
| Construction Yard | Blohm und Voß, Hamburg |
| Yard Number | 607 |
| Ordered | 15th Aug 1940 |
| Keel laid | 5th Sep 1941 |
| Launched | 27th May 1942 |
| Commissioned | 16th Jul 1942 |
| Baubelehrung | 8.KLA, Hamburg | | Training, Flotillas and Duties | | 07.42 - 12.42 | 5.U-Flottille, Kiel Ausbildungsboot (under training)
|
| 01.43 - 10.43 | 9.U-Flottille, Brest Frontboot (operational)
|
| Commanders | | 07.42 - 10.43 | OL Jürgen Krüger see also: U-141 |
| Operations information for U-631 | 19.12.1942 - 04.02.1943 First Sailing - active patrol
U-631 left Kiel under the command of Jürgen Krüger on 19th Dec 1942 and arrived at return on 4th Feb 1943 after more than six weeks. At 1358 HRS on 17th Jan 1943 in square AK 32, U-631 came under attack from an unidentified aircraft. U-631 was not damaged by the attack.
Jürgen Krüger hit one ship on this patrol from convoy ONS-156.-
On 29th Dec 1942 he sank the Norwegian 3,978 ton Ingerfem, sailing with convoy ONS-156.
You can read more about the Norwegian ship listed for this patrol at www.warsailors.com.
Click the link for more information on Ingerfem.
| 06.03.1943 - 11.05.1943 Second Sailing - active patrol
On the 6th Mar 1943, U-631 left Brest under the command of Jürgen Krüger and after nine and a half weeks arrived at return on 11th May 1943. On 20th Mar 1943 in square AL 57, U-631 came under attack from an aircraft of RAF 201 Squadron. U-631 was only slightly damaged in the attack. The boat defended itself with flak without destroying the aircraft. On 21st Apr 1943 in square AJ 29, U-631 came under attack from an unidentified aircraft. U-631 was not damaged by the attack. At 0032 HRS on 22nd Apr 1943 in square AJ 29, U-631 came under attack from an unidentified aircraft. U-631 was not damaged by the attack.
Jürgen Krüger hit one ship on this patrol from convoy HX-229.-
On 17th Mar 1943 he sank the Dutch 5,158 ton Terkoelei, a member of convoy HX-229.
| 18.09.1943 - 17.10.1943 Third Sailing
U-631 departed under Jürgen Krüger from Brest on 18th Sep 1943 and arrived at return on 17th Oct 1943 after just over four weeks.
|
| | | We have extra information on 2 relevant ships here:
|
|
|
|